Filter by:
Sort by:
How do I find a good multi-skilled builder? Are there many or do most builders have a specialism these days?
What plans do I need for a dormer loft conversion. Truss roof, built in 2013, 3 bed semi detached, permitted development. I think an architect may be a bit overkill for what I am trying to achieve. I was thinking building regulation plans or can I just do a building notice? I assume I will also need a structural engineer to do the calcs.
I’ve read that it can take up to eight weeks for planning permission approval. How long does it actually take on average?
Are all builder quotes free with no obligation as standard? Or do some job quotes have costs or conditions attached?
What are the arguments for and against having my basement converted into a functional room?
Is it possible to find someone to check and if necessary to repair the joists in kitchen to see if they are sound..
Can I remove my old kitchen units myself, how difficult is it, only a small kitchen
My neighbour has had her half of our semi detach house roof replaced. The builder has cut the tiles on the boundary rather than interlock them. Will this cause us roof problems in the future
With a loft conversion can I fix external wall insulation to the dormer of a loft conversion instead of hanging tiles? I’ll then render the polystyrene sheets to match the existing look of the house. Does this go against building regulations?
What price would I be looking at to build a reinforced block wall 18m long and 1.8m high in the garden with foundations and bars/mesh.
Are you looking for advice on a DIY project or have a question for our tradespeople?
We'll email your question to tradespeople who are skilled in your chosen category.
{{ first(ask.errors)[0] }}
Over 1 million homeowners and over 50,000 tradespeople
use MyJobQuote nationwide each year